S40/V40
1. General information
2. Operation and maintenance of the car
3. Design and technical characteristics of engines
4. Repair of the engine
4.1. Removal of a head of the block of cylinders
4.2. Installation of a head of the block of cylinders
4.3. Removal and installation of support of the engine
4.4. Removal of the engine
4.5. Dismantling and assessment of a condition of details of the engine
4.6. Assembly and installation of the engine
5. Transmission
6. Brake system
7. Forward suspension bracket and steering
8. Back suspension bracket
9. Control system of the Fenix 5.1 engine
10. Electric equipment. Conducting and components
11. Body
12. Schemes of electric equipment
 



13c91ae0




4-1-snyatie-golovki-bloka-cilindrov.html

4.1. Removal of a head of the block of cylinders

The sequence of actions at removal of a head of the block of cylinders:
1) merge cooling liquid for what:
— disconnect a negative wire of the rechargeable battery;
— uncover a broad tank;
— remove a guard under the engine;
— open unions of the engine and a radiator, for collecting liquid use a hose;
— merge liquid, close unions;
2) remove a final collector for what:

Fig. 4.1. Scheme of removal of a final collector


— turn out bolts of flange connection of a reception pipe of the muffler with a final collector (fig. 4.1);
— remove the oxygen probe;
— turn off two bolts of flange connection of a reception pipe of the muffler with converter;
— remove a reception pipe of the muffler;
— remove two heat-insulating screens;
— turn off nuts of fastening of a collector to a head of the block of cylinders;
— turn a collector on 90 ° clockwise and lift it;

       PREVENTION
1. For cars with the air conditioner: do not damage pressure sensor on a tube of the air conditioning system.
2. At assembly apply on threaded connections the stopping liquid (strong) 1161076-5.


3) take off a belt of the gas-distributing mechanism for what:
— lift the block of the distributor of fuel and a nozzle and put sideways;

Fig. 4.2. Removal of fuel nozzles


— put on a nozzle holders (fig. 4.2);
4) remove wattled wires of connection with "weight" from the engine;
5) remove an inlet collector;
6) remove the top hose of a radiator of the engine from the thermostat;

Fig. 4.3. Removal of pulleys of the camshaft


7) remove camshaft pulleys by means of the holder of 999 5199 (fig. 4.3), mark pulleys (inlet/final);
8) turn out a bolt to an internal cover of a belt of the gas-distributing mechanism;
9) remove the air filter with hoses;

Fig. 4.4. Arrangement of the sensor of position of the camshaft


10) remove the sensor of position of the camshaft and a diaphragm (fig. 4.4);
11) remove a conducting plait guide;

Fig. 4.5. Direction of a reversing of bolts


12) turn out bolts, moving ahead outside to the middle of the top half of a head of the block (fig. 4.5);
13) having carefully tapped the top half of a head of the block the copper hammer from a forward part of camshafts, hype up and accurately remove the last;
14) mark camshafts and remove them;
15) turn out two bolts of tubes of cooling liquid;

Fig. 4.6. Sequence of a reversing of bolts of a head of the block of cylinders


16) turn out bolts of a head of cylinders (moving ahead outside to the middle) (fig. 4.6);
17) remove a head of cylinders;
18) remove laying of a head of cylinders;
19) after removal examine and smooth out:
— surfaces of a final collector / head of cylinders;
— a surface for laying of blocks of cylinders;
— a surface for laying of a tube of cooling liquid;
— a surface between the lower and top half of a head of cylinders.

       PREVENTION
Do not use a metal scraper. Use the soft pallet and if it is necessary, solvent for pro-masonry mastic 1161340-3. For ensuring tightness of a surface have to be absolutely pure. At use of solvent it is necessary to work under the exhaust ventilation.